15900 Clinton River Road
Clinton Township, Michigan 48038

Closed / MLS #58050177125 / Single Family / Clinton Township
Listing information updated 7/15/2025 at 2:05pm
Welcome to this beautifully maintained home in Clinton Township, located in the desirable Chippewa Valley School District. Situated on nearly an acre with city water and sewer, this property offers both space and convenience. Enjoy peace of mind with a newer roof (2018), Trane furnace (2013), central air (2023), and water heater (2020). The spacious kitchen includes the stove, refrigerator, dishwasher, and microwave. Also included are the clothes washer and dryer. Featuring 2 full baths, a half bath in second floor bedroom & a full bath in the finished basement. Sump pump with battery backup, a wraparound wood deck, and a privacy fence. A real country charmer with the convenience of being close to everything. This home is move-in ready, and a very rare find with room to grow!

Listing Office: RE/MAX First

Listing Office Phone: 586.799.8000

Disclaimer: IDX provided courtesy of Realcomp II Ltd. via site owner and the originating MLS listed above, © 2025 Realcomp II Ltd. Shareholders. IDX information is provided exclusively for consumers' personal, noncommercial use and may not be used for any purpose other than to identify prospective properties consumers may be interested in purchasing. The accuracy of all information, regardless of source, is not guaranteed or warranted. All information should be independently verified.

Map of 15900 Clinton River Road, Clinton Township, MI 48038

Not quite what you are looking for?

Similar listings for sale near 15900 Clinton River Road, Clinton Township, MI 48038


Like the area?

More homes for sale near 15900 Clinton River Road, Clinton Township, MI 48038


15900 Clinton River Road, Clinton Township, MI 48038 is a single family home which sold for . 15900 Clinton River Road features 3 Beds, 2 Baths, 1 Half Bath. This single family home has been listed on @properties REMI Christie's International Real Estate since June 4th, 2025 and was built in 1931.