1911 W Centre Avenue #1

Portage, Michigan 49024
Rented / MLS #14008948 / Office / Tech / Portage
Listing information updated 8/29/2017 at 2:26pm
What a substantial all-brick professional office opportunity on the best-traveled east / west corridor in Portage. Commercial signage options could not be better. Wonderfully accessible architectural plan. Plenty of parking on both levels. Flexible interior floor plans and a history of exceptional hard-wire fiber optic connectivity. Full kitchens with dining areas on both levels with wheelchair-accessible bathrooms too. Custom-built as a law office and includes reinforced floors for all the filing cabinets you can muster. Extra entry doors, four HVAC units set up on 3-phase electric, and large conference rooms were engineered as part of this functional office building design. The lower level has a huge central open area. Approximately two acres south of the building has potential

Full Features

Lot Size:
4.11 acres - 179,032 square feet
Acreage:
4.1100
Built:
1989
Parking Spaces:
100
Cooling System:
Central
Stories:
2.00
Roof:
Comp Shingle
Potential Use:
Office
Zoning:
OS-1
Rentable Square Feet:
3,627
Office Square Feet:
9,000

Rental Information

Security Deposit:
Pet Info:
Furnished:
No

Location

Zip Code:
49024
City:
Portage
County:
Kalamazoo

Listing Office: Callander Commercial

Listing Office Phone: 269.349.1000

Disclaimer: The data relating to real estate for sale on this website comes in part from the Broker Reciprocity Program of SWMRIC, LLC. Real estate listings held by brokerage firms other than @properties are marked with the Broker Reciprocity thumbnail logo and detailed information about them includes the name of the listing brokers.


Not quite what you are looking for?

Similar listings for sale near 1911 W Centre Avenue #1, Portage, MI 49024


Like the area?

More homes for sale near 1911 W Centre Avenue #1, Portage, MI 49024


1911 W Centre Avenue #1 is a office / tech which rented for $21. This office / tech has been listed on @properties since February 28th, 2014 and was built in 1989.